• Home
  • Soil Stabilization
  • The Process
  • Contact Us
Fast Road BuildFast Road Build
To enable the benefits of reliable transportation through fast, sustainable, and cost effective solutions.
  • Home
  • Soil Stabilization
  • The Process
  • Contact Us

Build roads that last with FAST ROAD SOLUTION FASTER - STRONGER - BETTER ROAD CONSTRUCTION ENVIRONMENTALLY FRIENDLY Caption Text6 water resistant

Build perpetual roads with Fast Road Solution

Fast Road Solution are not new products. It has been used for over 10 years in various forms in the road industry. Through Fast Road Build Inc expansion, this technology is being introduced to many markets around the world. Our engineering teams analyze the requirements, attend the site during construction and ensure results are delivered.

Why use Fast Road Solution [FRS] building roads?

COMPARISON MATRIX – CONVENTIONAL TO FAST ROAD BUILD

DESCRIPTION

STANDARD BUILD

BUILD WITH FRS

ENVIRONMENTAL IMPACT

Construction Time

15-35 days/km

5-15 days/km

Fugitive dust reduced by up to 80%

Water Permeability

High - easily soaked

Very Low - less than 1 x10 cms/s

Long lasting - 95% moisture resistant

Compaction **

90 -100 CBR

80 -100+ CBR

Longer lasting and stronger

Aggregates/gravels

450-500 truckloads/km

40 truckloads/km

90% reduction of emissions

Native Soil Removal

500 truckloads/km

50 truckloads/km

90% reduction of emissions

Add cement (if specified)**

0

Max of 3%

Possible small increase

Environmental Impact

Substantial

Minimal

Dramatic Improvement

Impact on Native Animals

Substantial

Medium

Dramatic Improvement

Impact on Native Plants

Substantial

Medium

Dramatic Improvement

Project Impact - Time Savings

Projects take years to install and the final road opening can delay market access, or resource access for years

Final use of road is 5+ times sooner access to markets, mines, resources or ports can be years earliert

Most environmental impacts are worsened by time disturbing the region.  FRS dramatically reduces that time

Road Maintenance Cost

10%  per year

5% per year - gravel replacement and dust mitigation is virtually eliminated

Minimal dust is produce by roads since all solids are bound into the road bed and gravel is held by FRS as well

Costs impacts of above

0%

Up to 15% savings

Road Life

2-5 years

10+ years

Cradle to grave dramatic improvement in road reliability, cost reductions and environmental impact

SEE ROAD REHABILITATION PROCESS WITH FRS

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Send Message

WHAT WE DO

Logo

Build high strength, water resistant, and organic road base with FRS

Contact Info

  • Fast Road Build Inc
  • 1175 Stellar Dr. Unit 4
  • admin@fastroadbuild.com
  • https://fastroadbuild.com

Links:

Soil Stabilization

The Process

© 2025 — Alternate Web Solutions